Godrej Sarjapur follows a Construction-Linked Plan (CLP) — a minimum booking amount at reservation, with the remaining balance released in slab-wise instalments as construction progresses, and financing available up to 90% of the unit cost. As of the most recent listing update, the project's RERA registration was still pending — verify current status before making any payment (see the RERA section below).
All-Inclusive Pricing by Unit
| Configuration | Build-up Area | Carpet Area | All-Inclusive Price | Approx. Min. Booking Amount |
|---|---|---|---|---|
| 2 BHK | 1,200 sq. ft. | 720 sq. ft. | ₹1.40 Cr | ~₹14 Lakh (≈10%) |
| 3 BHK | ~1,500 sq. ft. | 901 sq. ft. | ₹1.80 Cr | [confirm — scale proportionally] |
| 3 BHK | ~1,800 sq. ft. | 1,080 sq. ft. | ₹2.20 Cr | [confirm — scale proportionally] |
"All-inclusive" here covers base cost, applicable GST, and possession charges. Stamp duty and registration are excluded and payable separately. Pricing varies by floor and tower placement — get your exact unit quote from the full cost sheet.
How the CLP (Construction-Linked Plan) Works
Godrej Sarjapur's payment structure is a standard slab-wise CLP: you pay a minimum booking amount to reserve your unit (approximately 10% of the all-inclusive price, based on the 2 BHK figures above), and the remaining balance is released in instalments tied to construction milestones — foundation, slab levels, finishing, and possession — rather than in one lump sum.
Banks financing this project can lend up to 90% of the unit cost, with disbursement following the same slab-wise schedule as your own payments.
For the complete stage-by-stage percentage breakdown, see our 20:20:60 Payment Plan variant, which some buyers at this project opt into in place of the standard slab-wise CLP — confirm with the sales team which structure applies to your specific booking.
Project Snapshot (for context on the numbers above)
- Location: Kada Agrahara Road, Sarjapur, Bangalore — full address and connectivity details on our Address & Location page
- Land parcel: 40 acres, 2 towers, 3 basements + ground + 33 floors
- Configurations: 2 BHK and 3 BHK only
- Target & RERA possession: December 2030
- Construction status: Approximately 1% complete as of mid-July 2026 (i.e., very early pre-launch stage — factor this into your payment timeline expectations)
- Litigation: None reported as of the last available update
Monthly Maintenance (Post-Possession Cost to Budget For)
| Configuration | Monthly Maintenance |
|---|---|
| 2 BHK | ~₹7,200 |
| 3 BHK | ~₹9,000–₹10,800 |
This is separate from your instalment schedule and only applies from possession onward — worth factoring into your post-handover budget alongside your final instalment.
Financing: Banks Approved for This Project
At last check, the following lenders had approved financing for Godrej Sarjapur: State Bank of India, HDFC Bank, ICICI Bank, Axis Bank, Kotak Mahindra Bank, Bank of Baroda, Bank of India, Union Bank of India, Central Bank of India, and Citibank.
Bank approval is project-specific, not just borrower-specific — confirm your chosen lender is still on the current approved list before applying, since these lists are periodically updated.
What Banks Typically Check
- Credit score (750+ generally preferred)
- Stable income and employment history
- Identity, address, and income documentation
- The bank's own approval of this specific project
Payment Plan for NRI Buyers
NRI buyers can purchase under FEMA regulations, with payments routed through NRE or NRO accounts. Home loans are available from Indian banks but typically require a co-applicant. Documentation generally includes PAN, standard KYC, and — where you won't be signing each instalment in person — a Power of Attorney.
RERA Status: Verify Before You Pay Anything
Before making any payment — booking amount included:
- Check the project's current RERA status directly on the Karnataka RERA project portal.
- If registration is still pending, understand that pre-RERA payments carry materially different legal protections than post-registration payments — ask the sales team directly what stage the registration is at before committing funds.
- Once registered, confirm the registration number matches this exact project, phase, and promoter — several similarly-named projects exist in this corridor.
- All payments should go into the project's RERA-designated escrow account once that account exists.
What's Included vs What's Extra
| Item | Included in All-Inclusive Price? |
|---|---|
| Base apartment cost | Yes |
| GST | Yes |
| Possession charges | Yes |
| Stamp duty | No — extra |
| Registration | No — extra |
| Preferential Location Charges (PLC) | No — confirm on cost sheet |
| Monthly maintenance (post-possession) | No — separate, see table above |
FAQs
A Construction-Linked Plan (CLP): a minimum booking amount (~10% of unit price) at reservation, with the balance in slab-wise instalments tied to construction progress. Financing up to 90% is available from approved banks.
Approximately ₹14 lakh for the 2 BHK (~10% of the ₹1.40 Cr all-inclusive price). For 3 BHK units, expect a proportional amount — confirm the exact figure on our cost sheet.
As of the most recent available data, registration was still pending. Verify current status on the Karnataka RERA portal before making any payment.
SBI, HDFC, ICICI, Axis, Kotak Mahindra, Bank of Baroda, Bank of India, Union Bank, Central Bank of India, and Citibank were approved as of the last update — confirm current approval before applying.
Yes, via NRE/NRO accounts under FEMA regulations, typically with a co-applicant for financing.
Roughly ₹7,200 for 2 BHK and ₹9,000–₹10,800 for 3 BHK, separate from the instalment schedule.